Wednesday, February 19, 2020

Define the factors that affect patient wound healing Essay

Define the factors that affect patient wound healing - Essay Example This is a local factor within the patient’s environment that stems from poor surgical practice, and may lead to a delay in the healing of a wound (Baillie 2014, p. 78). Also, the extent of tissue damage may influence how fast or well a wound heals. If there are continuous problems within the tissue, it may take a longer period for a patient to heal. Secondly, there is the presence of vascular disorders. Examples include; arteriosclerosis and venous deficiency. The above could be classified under some of the local factors that affect the healing process of patients, which may not be within the patient’s control (Baranoski & Ayello 2008, p. 57). Age, which is among the systemic factors, may also impact the rate at which a patient heals from a wound. This is through a weakened expression of metalloproteinases. Furthermore, the kind of medication that a patient is exposed to may alter the rate at which he/she heals from a wound (Vincent 2011, p. 84). Some topically used medicine may affect the patient’s healing power, making the wound heal slower than it would have under other

Tuesday, February 4, 2020

Measure the warehouse efftiency Essay Example | Topics and Well Written Essays - 1250 words

Measure the warehouse efftiency - Essay Example MRP will provide you with the ability to be pro-active rather than re-active in the management of your inventory levels and material flow (Inventory Solutions Logistics Corp). has developed for production, inventory, staffing, etc. It sets the quantity of each end item to be completed in each week of a short-range planning horizon. A Master Production Schedule is the master of all schedules.It is a plan for future production of end items. The Master Production Schedule gives production, planning, purchasing, and top management the information needed to plan and control the manufacturing operation. The application ties overall business planning and forecasting to detail operations through the Master Production Schedule. A bill of materials or bill of material (abbreviated "BOM") describes a product in terms of its assemblies, sub-assemblies, and basic parts. Basically consisting of a list of parts, a BOM is an essential part of the design and manufacture of any product. top level, BOM describing a list of components and sub-assemblies. Take a PC, for example: the top level BOM might list the shipping box, manual, packaging, packaging labels and the actual PC. The BOM for the PC itself is referenced in the top level BOM and would contain its own list of sub-assemblies like power supply, motherboard, case, etc. This increasing levThis increasing level of detail continues for all sub-assemblies until it reaches its constituent parts (like resistors or processors), or modules that are out of the scope of the BOM (like the parts that make up a fan that is brought in as a module from another manufacturer). BOMs are important, since without a basic knowledge of how many parts a product needs, there is no way of knowing how many units of that part you need to buy. A bill of material can define products as they are designed, as they are manufactured, as they are ordered, as they are built, or as they are maintained. There are different types of bills of materials dependent upon the discipline that generates them and the purpose for which they are intended. It is important to ensure the type of bill of material that you have and its intended use prior to working with a bill of material. 3. Part Lead Times A lead time is the period of time between the initiation of any process of production and the completion of that process. Thus the lead time associated with ordering a new car from a manufacturer may be anywhere from 2 weeks to 6 months. In industry, lead time reduction is an important part of lean manufacturing. An MRP calculates Lead time quite efficiently. The other functionalities include 1.